{"id":3373,"date":"2020-10-28T16:01:07","date_gmt":"2020-10-28T16:01:07","guid":{"rendered":"https:\/\/durolabs.co\/?p=3373"},"modified":"2024-12-16T20:16:04","modified_gmt":"2024-12-16T20:16:04","slug":"change-management-with-duro-and-onshape","status":"publish","type":"post","link":"https:\/\/durolabs.co\/blog\/change-management-with-duro-and-onshape\/","title":{"rendered":"How to Set up PLM Hardware Change Management &#038; Release Workflows with Duro &#038; Onshape"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"3373\" class=\"elementor elementor-3373\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-39c5d0e7 posts-inner-container e-flex e-con-boxed e-con e-child\" data-id=\"39c5d0e7\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-50ab020 post-text-block elementor-widget elementor-widget-text-editor\" data-id=\"50ab020\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>We previously explained why <a href=\"https:\/\/durolabs.co\/blog\/part-number-management-software\/\" target=\"_blank\" rel=\"noopener\">hardware companies should implement<\/a> two-phase release and change management and release workflows.\u00a0Below, we explain how Onshape users can achieve this using Duro and Onshape.<\/em><\/p><p>This step-by-step guide demonstrates how Onshape users can\u00a0integrate <a href=\"https:\/\/www.onshape.com\/cad-blog\/onshape-partner-spotlight-duro-cloud-plm-for-distributed-hardware-teams\" target=\"_blank\" rel=\"noopener\">Onshape Release Management<\/a> with Duro PLM to build a powerful two-phase change order and release workflow.\u00a0<\/p><p>Not currently an Onshape user?\u00a0<a href=\"http:\/\/www.onshape.com\/\" target=\"_blank\" rel=\"noopener\">Learn more<\/a>\u00a0about how to use Onshape\u2019s change management technology and their industry-leading cloud mechanical CAD platform.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-eaa560f elementor-widget elementor-widget-heading\" data-id=\"eaa560f\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Step 1<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-35928915 post-text-block elementor-widget elementor-widget-text-editor\" data-id=\"35928915\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The first step, once you\u2019ve subscribed to the\u00a0<a href=\"https:\/\/appstore.onshape.com\/apps\/Data%20Management\/JMRLHGAIKRKN2YYW5RVGAUIE7JYIXZ6I6EUYN3A=\/description\" target=\"_blank\" rel=\"noopener\">Duro PLM app<\/a>\u00a0in Onshape, is to assign\u00a0Duro-based Part Numbers\u00a0to your parts and assemblies in Onshape through the Pull Part Number feature.<\/p><p>See our\u00a0<a href=\"https:\/\/www.durolabs.co\/blog\/2020\/9\/16\/how-duros-part-numbering-system-works-with-onshape\" target=\"_blank\" rel=\"noopener\">step-by-step guide\u00a0<\/a>on Duro\u2019s Part Numbering System with Onshape and discover change management solutions.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-14400a8 elementor-widget elementor-widget-heading\" data-id=\"14400a8\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Step 2<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8744c99 post-text-block elementor-widget elementor-widget-text-editor\" data-id=\"8744c99\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"text-align: var(--text-align);\">The second step is to set each component to the correct status value in Duro, to assure the component is revision controlled within Duro. This can be done quickly in edit mode of the Part View for any component loaded in the Duro PLM app. To properly enable the two phase release and approval workflow you\u2019ll want to select either Prototype or Production status.<\/span><\/p><p>\u00a0<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8c42a39 elementor-widget elementor-widget-heading\" data-id=\"8c42a39\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Figure 1: Selection of Status value in right sidebar of Duro PLM app<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-11c2c3e elementor-widget elementor-widget-image\" data-id=\"11c2c3e\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"431\" height=\"601\" src=\"https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.01.15AM.png\" class=\"attachment-full size-full wp-image-3306\" alt=\"\" srcset=\"https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.01.15AM.png 431w, https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.01.15AM-215x300.png 215w\" sizes=\"(max-width: 431px) 100vw, 431px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Selection of Status value in Duro PLM<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-49263715 post-text-block elementor-widget elementor-widget-text-editor\" data-id=\"49263715\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Duro runs a <a href=\"https:\/\/duro.zendesk.com\/hc\/en-us\/articles\/360029931491-Lifecycle-Status-and-Revision\" target=\"_blank\" rel=\"noopener\">progressive lifecycle status system<\/a>\u00a0that identifies the appropriate stage of the lifecycle for all components. The system mirrors the natural progression of a component (or Product) as it matures from an initial concept design through prototyping, into production, and eventual end of life. The Lifecycle Status value options in Duro include: Design, Prototype, Production, or Obsolete.<\/p><p>When in \u201cDesign\u201d Status, a component can be submitted for approval (or released without submitting for peer approval) within Onshape. Once approved, Onshape will immediately publish the released documents to Duro, without initiating any approval cycles in Duro.<\/p><p>When a component is set to \u201cPrototype\u201d or \u201cProduction\u201d Status, the component is now eligible to go through a review and approval process in both Onshape and Duro. A diagram of the entire process is depicted in Figure 2 below.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cd7c451 elementor-widget elementor-widget-heading\" data-id=\"cd7c451\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Figure 2: Onshape-Duro Two-Phase Change Order and Release Workflow<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8de9769 elementor-widget elementor-widget-image\" data-id=\"8de9769\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"970\" height=\"584\" src=\"https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-15at2.40.43PM.png\" class=\"attachment-full size-full wp-image-3317\" alt=\"\" srcset=\"https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-15at2.40.43PM.png 970w, https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-15at2.40.43PM-300x181.png 300w, https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-15at2.40.43PM-768x462.png 768w\" sizes=\"(max-width: 970px) 100vw, 970px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Onshape-Duro Two-Phase Change Order and Release Workflow<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-edda09a elementor-widget elementor-widget-heading\" data-id=\"edda09a\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Step 3<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9c66709 post-text-block elementor-widget elementor-widget-text-editor\" data-id=\"9c66709\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>For this step, you need to create a <strong>Release Candidate<\/strong> in Onshape, <strong>add approvers<\/strong> and <strong>Submit<\/strong>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5dd9216 elementor-widget elementor-widget-heading\" data-id=\"5dd9216\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Figure 3\u00a0: Onshape Release Candidate<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5b219ba elementor-widget elementor-widget-image\" data-id=\"5b219ba\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"850\" height=\"627\" src=\"https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.04.22AM-1.png\" class=\"attachment-full size-full wp-image-3321\" alt=\"\" srcset=\"https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.04.22AM-1.png 850w, https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.04.22AM-1-300x221.png 300w, https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.04.22AM-1-768x567.png 768w\" sizes=\"(max-width: 850px) 100vw, 850px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Onshape Release Candidate<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a438e99 post-text-block elementor-widget elementor-widget-text-editor\" data-id=\"a438e99\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>At this point, two things will happen. First, Onshape will send notifications to any team members listed in the \u201cApprovers\u201d field in the Release Candidate.<\/p><p>Second, Duro will automatically generate a Change Order for the corresponding components in Duro. In Duro, at the top of each component page (for the components included in the release candidate), a banner will be visible, indicating that the component has been added to a Change Order.\u00a0<\/p><p>By clicking the link in the banner, you can access the Change Order and begin preparing to submit it for approval.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ec619a9 elementor-widget elementor-widget-heading\" data-id=\"ec619a9\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Step 4<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7ff3682 post-text-block elementor-widget elementor-widget-text-editor\" data-id=\"7ff3682\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Click the link included in the banner showing at the top of the component page (see Figure 4 below) and then, once the corresponding Change Order page has loaded, click Edit to begin editing the Change Order and preparing to submit the Change Order for approval.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9ce8ea8 elementor-widget elementor-widget-heading\" data-id=\"9ce8ea8\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Figure 4: Duro component page showing banner after submitting Release Candidate in Onshape<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c9eb48f elementor-widget elementor-widget-image\" data-id=\"c9eb48f\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1169\" height=\"410\" src=\"https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.12.03AM-1.png\" class=\"attachment-full size-full wp-image-3325\" alt=\"\" srcset=\"https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.12.03AM-1.png 1169w, https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.12.03AM-1-300x105.png 300w, https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.12.03AM-1-1024x359.png 1024w, https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.12.03AM-1-768x269.png 768w\" sizes=\"(max-width: 1169px) 100vw, 1169px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Duro Components page <\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d19decc elementor-widget elementor-widget-heading\" data-id=\"d19decc\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Step 5<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e383d84 post-text-block elementor-widget elementor-widget-text-editor\" data-id=\"e383d84\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Submit the Change Order for approval from the edit mode of the change order dialogue (See Figure 5 below). Once you submit it, the included approvers will be notified and prompted to approve or reject the Change Order.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-da39a96 elementor-widget elementor-widget-heading\" data-id=\"da39a96\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Figure 5: Duro Change Order in edit mode \u2013 ready to submit for approval<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-908c259 elementor-widget elementor-widget-image\" data-id=\"908c259\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"738\" src=\"https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.21.30AM.png\" class=\"attachment-full size-full wp-image-3331\" alt=\"\" srcset=\"https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.21.30AM.png 900w, https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.21.30AM-300x246.png 300w, https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/ScreenShot2020-10-28at10.21.30AM-768x630.png 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Duro Change Order in edit mode <\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-61b4b68d post-text-block elementor-widget elementor-widget-text-editor\" data-id=\"61b4b68d\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>A fully approved Change Order will initiate a final release process, publishing all release drawings and production files from Onshape to Duro. See Figure 6 below with the Documents tab highlighted, showing three separate released documents: a PDF drawing and two production format CAD files (.STEP and Parasolid).<\/p>\n<p>A rejected Change Order will be eligible to resubmit, pending any edits, or can be closed. A rejected and closed Change Order in Duro will initiate a rejection of the Onshape Release Candidate, sending the revision back to the previous value.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0590a07 elementor-widget elementor-widget-heading\" data-id=\"0590a07\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Figure 6: Release production format files in Duro<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5bceebc elementor-widget elementor-widget-image\" data-id=\"5bceebc\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1139\" height=\"674\" src=\"https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/Docs_highlighted.png\" class=\"attachment-full size-full wp-image-3337\" alt=\"\" srcset=\"https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/Docs_highlighted.png 1139w, https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/Docs_highlighted-300x178.png 300w, https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/Docs_highlighted-1024x606.png 1024w, https:\/\/durolabs.co\/wp-content\/uploads\/2020\/10\/Docs_highlighted-768x454.png 768w\" sizes=\"(max-width: 1139px) 100vw, 1139px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Figure 6: Release production format files in Duro<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-47de1ba0 post-text-block elementor-widget elementor-widget-text-editor\" data-id=\"47de1ba0\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The two phase change order and release workflow described above presents a powerful extension of the existing Release Management capabilities of Onshape. Team members that work outside of Onshape can now participate in the review and approval process for critical engineering and manufacturing changes. Furthermore, all released data, records and files are centralized in a single source of truth, accessible to all.<\/p><p>To learn more about how to use Onshape &amp; Duro, improved Release and Change Management, Release Workflow or even how to leverage a PLM-based Part Numbering System with our change order software,\u00a0<a href=\"https:\/\/calendly.com\/d\/cp3-5w9-nqd\/discovery-call-leading-to-demo\" target=\"_blank\" rel=\"noopener\">sign up for a demo of Duro<\/a>. Alternatively, take a quick tour of Duro PLM using the banner below.\u00a0<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6355d58 elementor-widget elementor-widget-image\" data-id=\"6355d58\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/durolabs.co\/request-demo\/\">\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"124\" src=\"https:\/\/durolabs.co\/wp-content\/uploads\/2024\/05\/Case-study-banners.webp\" class=\"attachment-full size-full wp-image-12073\" alt=\"\" srcset=\"https:\/\/durolabs.co\/wp-content\/uploads\/2024\/05\/Case-study-banners.webp 1000w, https:\/\/durolabs.co\/wp-content\/uploads\/2024\/05\/Case-study-banners-300x37.webp 300w, https:\/\/durolabs.co\/wp-content\/uploads\/2024\/05\/Case-study-banners-768x95.webp 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/>\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>We previously explained why hardware companies should implement two-phase release and change management and release workflows.\u00a0Below, we explain how Onshape users can achieve this using Duro and Onshape. This step-by-step guide demonstrates how Onshape users can\u00a0integrate Onshape Release Management with Duro PLM to build a powerful two-phase change order and release workflow.\u00a0 Not currently an [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":3280,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"none","_seopress_titles_title":"How to Set up PLM Hardware Change Management & Release Workflows with Duro & Onshape","_seopress_titles_desc":"Integrate Onshape with Duro PLM to streamline change management, automate approvals, and centralize product release data in a simple workflow.","_seopress_robots_index":"","footnotes":""},"categories":[93],"tags":[],"resource-tag":[79],"class_list":["post-3373","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","resource-tag-hardware-engineering"],"acf":[],"_links":{"self":[{"href":"https:\/\/durolabs.co\/wp-json\/wp\/v2\/posts\/3373","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/durolabs.co\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/durolabs.co\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/durolabs.co\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/durolabs.co\/wp-json\/wp\/v2\/comments?post=3373"}],"version-history":[{"count":44,"href":"https:\/\/durolabs.co\/wp-json\/wp\/v2\/posts\/3373\/revisions"}],"predecessor-version":[{"id":17696,"href":"https:\/\/durolabs.co\/wp-json\/wp\/v2\/posts\/3373\/revisions\/17696"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/durolabs.co\/wp-json\/wp\/v2\/media\/3280"}],"wp:attachment":[{"href":"https:\/\/durolabs.co\/wp-json\/wp\/v2\/media?parent=3373"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/durolabs.co\/wp-json\/wp\/v2\/categories?post=3373"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/durolabs.co\/wp-json\/wp\/v2\/tags?post=3373"},{"taxonomy":"resource-tag","embeddable":true,"href":"https:\/\/durolabs.co\/wp-json\/wp\/v2\/resource-tag?post=3373"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}